ICTAD BSR PDF

Construction BSR · Construction BSR Last Updated on Wednesday, 12 September Copyright © Department of Buildings. The item description of the B.S.R. has been drafted with a view to directly Spray painting shall do in ICTAD SCA/4/1 clause (f). ICTAD/SBD/01 (Vol-1) ICTAD Formula Method – [2nd Edition – June ] BSR. Building Schedule of Rates. SPECIFICATIONS. CIDA/SP/

Author: Kazram Daibar
Country: Burkina Faso
Language: English (Spanish)
Genre: Finance
Published (Last): 27 November 2005
Pages: 69
PDF File Size: 4.40 Mb
ePub File Size: 2.15 Mb
ISBN: 496-2-91685-676-4
Downloads: 20277
Price: Free* [*Free Regsitration Required]
Uploader: Tygozuru

Show full item record.

Institutional-Repository, University of Moratuwa. JavaScript is disabled for your browser.

WORK NORM ANALYSIS FOR MEDIUM SCALE BUILDING PROJECTS: A CASE STUDY

Some features of this site may not work without it. It is accepted that construction industry plays a vital role in an economy of a given country.

In Sri Lanka, the construction sector was continuously growing at iictad rate in the pervious years and it has significantly contributed to the Sri Lankan economy. Material and labour components are the main inputs to the construction industry. Planning, controlling, and monitoring of material and labour components are the key factors to successfulness of projects.

  BAKTERI RUMEN SAPI PDF

The standard norms were developed many years ago in order to assist to the above functions. With technology transferring to the industry, work norms for construction industry are to be reviewed; however, it was not touched during the last two decades.

In fact it is very useful in estimating different parameters. The main objective of this research is to develop the work norms for building construction activities. Further, it investigates the experimental and BSR standard norms on few construction events.

:: The Construction Industry Development Authority ::

This thesis also describes the productivity of the labour, material consumption in construction work. Moreover, daily work completed, material consumption and labour involvements were closely examined in two different sites selected and all the data were recorded on daily basis with respect to the construction events.

The experimental data were analyzed by simple statistical techniques and compared with the standard norms available up to date. The research findings revealed that actual material consumption IS relatively high comparing to the standard BSR values which were previously developed. As per the findings of the research, cement and sand were excessively consumed in all construction events.

  2SD424 DATASHEET PDF

WORK NORM ANALYSIS FOR MEDIUM SCALE BUILDING PROJECTS: A CASE STUDY

In this research, daily labour outputs were also examined and it was found that productivity of the labour was higher than the BSR standard values. Br, it is recommended to review the previous standards in order to adapt the current practices. Document Type Year Conference Proceedings. Contact Us Send Feedback.